Documents end-to-end business processes using BPMN-style swim-lane diagrams and analyzes cycle times to identify bottlenecks, waiting times, and value-add ratios. It produces a ranked list of process constraints with root-cause hypotheses and deterministic throughput estimates based on Lean and Six Sigma principles.
Say it in your own words; the assistant finds this recipe by itself. Examples:
Use this skill when a BizOps lead or COO needs to document an internal business process like procurement, onboarding, or incident handoff. It is ideal for quantifying the gap between total elapsed time and actual work time, and for identifying specific stages where work is waiting or being reworked. It is the right tool when the goal is to find the single constraint in a repeatable workflow to improve operational efficiency.
BPMN-style business process documentation, bottleneck detection, and cycle-time analysis for internal-operations leaders.
Internal-operations work suffers from three recurring failure modes:
This skill produces a documented process map, identifies where work waits, and points the constraint out by name with deterministic logic — not LLM intuition.
Five-step deterministic flow:
name, owner, type (value-add | wait | rework), duration_minutes_p50, duration_minutes_p90. Use assets/process_template.md and its JSON skeleton.process_documenter.py to produce an ASCII swim-lane diagram + a normalized JSON artifact. The swim-lane separates lanes by owner so cross-functional handoffs become visible.cycle_time_analyzer.py to compute total P50, total P90, value-add ratio (VA%), and a Little's-Law throughput estimate. Verdict: VA% > 25% = HEALTHY, 10–25% = TYPICAL, < 10% = WASTE-HEAVY.bottleneck_detector.py with the appropriate --profile (saas / services / manufacturing / healthcare). Output is a ranked list with severity (CRITICAL / HIGH / MEDIUM), root-cause hypothesis, and one recommended action per finding.scripts/process_documenter.py — Reads a process JSON, validates it, and emits a text-based BPMN-style swim-lane diagram in Markdown (lanes by owner, stages annotated with type + duration). Also outputs a normalized JSON artifact for downstream tools. Stdlib only. --sample prints a 6-stage procurement-intake example.
scripts/bottleneck_detector.py — Applies three deterministic detection rules: (a) stage P50 > 2× mean of value-add stages, (b) wait-state % > 40% of total cycle, (c) rework % > 15%. Thresholds adjust by --profile because SaaS, services, manufacturing, and healthcare have different "normal" wait ratios. Output is a ranked list with severity, hypothesis, action.
scripts/cycle_time_analyzer.py — Computes total P50 and P90 cycle time, value-add ratio (VA%), wait %, rework %, and a Little's-Law throughput estimate (WIP / cycle time). Per Lean canon: VA% > 25% = HEALTHY, 10–25% = TYPICAL (most non-manufacturing processes land here), < 10% = WASTE-HEAVY.
# Renders a BPMN-style swim-lane diagram + normalized JSON for the built-in 6-stage procurement-intake example
cd business-operations/skills/process-mapper && python3 scripts/process_documenter.py --sample
references/lean_six_sigma_canon.md — TIMWOOD wastes, value-stream mapping, Theory of Constraints, Kanban WIP, Little's Law. Cites Womack & Jones, Rother & Shook, Goldratt, Ohno, Liker, Pyzdek, Anderson.references/bpmn_essentials.md — Pools, lanes, gateways, events, message flows, common notation mistakes. Cites the OMG BPMN 2.0 spec, Silver, Allweyer, Freund/Rücker, OASIS, ISO/IEC 19510:2013.references/bottleneck_anti_patterns.md — Seven specific anti-patterns drawn from Goldratt, Kim et al., Spear, DORA, Deming, and process-mining research.type is honest: a "value-add" stage labeled as such by the user really does change the work product from the customer's perspective. Mis-labelling waiting as value-add is the most common data-quality failure.Before invoking the tools, the orchestrator (or /cs-grill-bizops) walks the user through these questions one at a time, with a recommended answer + canon citation. Never bundled.
"Do you have measured cycle times for the top-3 longest stages, or only estimates?" Recommended: insist on measured data. Canon: Goldratt 1984 (The Goal) — optimizing estimated bottlenecks reliably attacks the wrong constraint.
"Are you mapping the current process (as-is) or the intended process (to-be)?" Recommended: map as-is first. To-be after bottleneck is identified. Canon: Rother & Shook 1999 (Learning to See) — value-stream mapping starts with the current state, always.
"Where do handoffs occur between teams, and how long does each handoff wait?" Recommended: log every handoff with median wait time. Canon: Reinertsen 2009 (Principles of Product Development Flow) — wait time at handoffs is the largest invisible cost.
"What's your batch size at each stage?" Recommended: drive batch size toward 1 wherever possible. Canon: Anderson 2010 (Kanban) — batch size correlates 1:1 with cycle time variance.
"What's the rework rate per stage?" Recommended: surface it explicitly; rework loops belong in the map. Canon: Pyzdek (Six Sigma Handbook) — hidden rework drives 30-50% of total cycle time in service processes.
Walk depth-first. Don't open question 4 before 1-3 are answered. After all 5 are locked, invoke process_documenter.py → bottleneck_detector.py → cycle_time_analyzer.py in sequence.
LICENSESKILL.mdassets/process_template.mdreferences/bottleneck_anti_patterns.mdreferences/bpmn_essentials.mdreferences/lean_six_sigma_canon.mdscripts/bottleneck_detector.pyscripts/cycle_time_analyzer.pyscripts/process_documenter.pyVendored from alirezarezvani/claude-skills, commit 27cfcd0fb0a4, path business-operations/skills/process-mapper, licence MIT. The upstream licence file ships inside the skill.